New Construction

Build Intelligence Into Your Foundation

The ideal time to integrate smart home technology is during construction. We partner with your design team from blueprints to move-in, ensuring seamless infrastructure and invisible technology.

New construction smart home integration

Our Process

Integrated With Your Construction Timeline

We align our milestones with your construction schedule, ensuring technology integration never delays your project.

01

Design Consultation

Schematic Design

We collaborate with your architect and builder during the design phase to plan infrastructure requirements, conduit runs, and equipment locations.

02

Pre-Wire Specification

Construction Documents

Detailed pre-wire documentation including cable schedules, junction box locations, and coordination with electrical and low-voltage contractors.

03

Rough-In Supervision

Framing Complete

On-site supervision during rough-in phase to verify proper installation of all low-voltage infrastructure before walls close.

04

Trim & Programming

Finish Phase

Installation of devices, keypads, and touchscreens. Complete system programming and scene configuration.

05

Client Training

Move-In

Comprehensive walkthrough of all systems. Personalized training for household members and staff.

Why Integrate During Construction

Integrated Documentation

Complete as-built documentation for your records and future reference.

Trade Coordination

We work directly with your GC, electrician, and AV contractor.

Timeline Alignment

Our milestones align with your construction schedule—no delays.

Future-Proof Design

Infrastructure designed for today's technology and tomorrow's innovations.

Complete System Integration

Every system designed to work together seamlessly through the Savant platform.

  • Intelligent lighting with circadian rhythm support
  • Whole-home audio and dedicated theater spaces
  • Climate control with zone management
  • Motorized shades and window treatments
  • Security and access control integration
  • Savant Power for energy independence
  • Network infrastructure and WiFi design

Ready to Discuss Your Project?

Share your plans with us for a confidential consultation. We'll review your blueprints and provide infrastructure recommendations.

Schedule Consultation

Or call directly: (773) 698-6148

Timeline Guide

Typical Project Timeline

Plan your construction schedule with confidence. We coordinate seamlessly with your GC.

Phase 1

Design & Pre-Wire

2-4 weeks

Site survey, system design, electrical plans

Phase 2

Procurement

4-6 weeks

Equipment ordering, programming prep

Phase 3

Installation

6-12 weeks

Rough-in, rack build, network deployment

Phase 4

Programming

2-4 weeks

Configuration, testing, optimization

Phase 5

Training

1 week

Owner training, documentation

Total Duration: 15-27 weeks from design to completion

Rush projects available for qualifying estates

New Construction Questions

Common questions from clients considering this service

Ideally during architectural planning, before walls are framed. Early involvement ensures proper infrastructure—conduit pathways, equipment room sizing, network distribution, and power requirements. This prevents costly retrofits and enables capabilities impossible to add later. We coordinate directly with your architect, builder, and design team throughout the process.