New Construction
Build Intelligence Into Your Foundation
The ideal time to integrate smart home technology is during construction. We partner with your design team from blueprints to move-in, ensuring seamless infrastructure and invisible technology.

Our Process
Integrated With Your Construction Timeline
We align our milestones with your construction schedule, ensuring technology integration never delays your project.
Design Consultation
Schematic DesignWe collaborate with your architect and builder during the design phase to plan infrastructure requirements, conduit runs, and equipment locations.
Pre-Wire Specification
Construction DocumentsDetailed pre-wire documentation including cable schedules, junction box locations, and coordination with electrical and low-voltage contractors.
Rough-In Supervision
Framing CompleteOn-site supervision during rough-in phase to verify proper installation of all low-voltage infrastructure before walls close.
Trim & Programming
Finish PhaseInstallation of devices, keypads, and touchscreens. Complete system programming and scene configuration.
Client Training
Move-InComprehensive walkthrough of all systems. Personalized training for household members and staff.
Why Integrate During Construction
Integrated Documentation
Complete as-built documentation for your records and future reference.
Trade Coordination
We work directly with your GC, electrician, and AV contractor.
Timeline Alignment
Our milestones align with your construction schedule—no delays.
Future-Proof Design
Infrastructure designed for today's technology and tomorrow's innovations.
Complete System Integration
Every system designed to work together seamlessly through the Savant platform.
- Intelligent lighting with circadian rhythm support
- Whole-home audio and dedicated theater spaces
- Climate control with zone management
- Motorized shades and window treatments
- Security and access control integration
- Savant Power for energy independence
- Network infrastructure and WiFi design
Ready to Discuss Your Project?
Share your plans with us for a confidential consultation. We'll review your blueprints and provide infrastructure recommendations.
Schedule ConsultationOr call directly: (773) 698-6148
Timeline Guide
Typical Project Timeline
Plan your construction schedule with confidence. We coordinate seamlessly with your GC.
Design & Pre-Wire
2-4 weeks
Site survey, system design, electrical plans
Procurement
4-6 weeks
Equipment ordering, programming prep
Installation
6-12 weeks
Rough-in, rack build, network deployment
Programming
2-4 weeks
Configuration, testing, optimization
Training
1 week
Owner training, documentation
Total Duration: 15-27 weeks from design to completion
Rush projects available for qualifying estates
New Construction Questions
Common questions from clients considering this service
Ideally during architectural planning, before walls are framed. Early involvement ensures proper infrastructure—conduit pathways, equipment room sizing, network distribution, and power requirements. This prevents costly retrofits and enables capabilities impossible to add later. We coordinate directly with your architect, builder, and design team throughout the process.